Intelligent work and resource scheduling system for a gas infrastructure contractor

This project is co-funded by the European Union under the European Funds for a Modern Economy 2021–2027 programme (Fundusze Europejskie dla Nowoczesnej Gospodarki). It is carried out within the Unicorn Hub Startup Booster acceleration programme, on the Technology Recipient cooperation track, through the Polish Agency for Enterprise Development (PARP).

The project designs and deploys an intelligent construction work scheduling system for a gas infrastructure contractor. The system automates work plan generation and construction crew assignment, accounting for crew availability and project constraints, replacing planning processes that are handled manually today. It is built on constraint-based scheduling engines and designed as an advisory tool: the planner keeps full control and can adjust any decision the system proposes.

Beneficiary
SOLUTIONSPACE Sp. z o.o.
Programme
  • European Funds for a Modern Economy 2021–2027
  • Unicorn Hub Startup Booster acceleration programme
  • Technology Recipient cooperation track
  • Operator: Polish Agency for Enterprise Development (PARP)

Project goals

  • Replace manual work and resource planning with a repeatable, automated process.
  • Cut the time needed to produce a schedule and reduce how often plans have to be reworked.
  • Capture crew availability and hard project constraints in a single model.
  • Keep the planner in charge: the system advises and proposes, a human approves.
  • Validate the solution in a real operating environment as the basis for further commercialisation.

Activities carried out in the project

The pilot runs with the Technology Recipient in three stages: process audit, prototype, then production deployment and validation.

Audit of the work and resource planning process

Mapping the current planning process, identifying bottlenecks and manual steps, estimating the time and cost of the process as it stands today, and analysing integration requirements. The outcome is a recommended scope and architecture for the prototype.

Prototype (PoC) design and build

Mockups of the key screens for each role, UX/UI review sessions with planners, implementation of the core planning functions together with hard constraints, and a mechanism that generates a work plan automatically for the planner to validate.

Test environment rollout and UAT

Integrating the prototype with the agreed data sources, running it in an isolated test environment, and user acceptance testing with the Technology Recipient's planners.

Production deployment and validation

Running the system on real data, measuring schedule preparation time against the pre-project baseline, surveying user satisfaction, and producing an improvement register and a development roadmap.

Target groups

Gas infrastructure and construction contractors

Companies running works across several sites at once, planning field crews and dealing with frequent rescheduling.

Planners and site managers

The people responsible for building schedules and assigning resources, who today work mostly in spreadsheets and general-purpose tools.

Field service companies with a similar profile

Longer term, commercial customers in other industries where resource planning is subject to comparable constraints.

Results and deliverables

  • Audit report on automating the work and resource planning process, approved by the Technology Recipient.
  • Report on the system mockups and the UX/UI review carried out with planners.
  • A working prototype (PoC) running in a test environment and verified through user acceptance testing.
  • The system deployed in the Technology Recipient's production environment and validated on real planning scenarios.
  • Validation report with satisfaction survey results, an improvement register and a development roadmap.

Project schedule

Three milestones delivered within the acceleration programme.

Milestone 131 August 2026

Audit of automation in the work and resource planning process

  • Map of the current planning process: data sources, decision points and constraints.
  • Catalogue of identified automation opportunities and manual steps.
  • Analysis of the time and cost of the current process, including estimated savings potential.
  • Analysis of requirements for possible integrations with the Technology Recipient's systems and infrastructure.
  • Recommended prototype scope and architecture as input to the next stage.
Milestone 231 October 2026

Scheduling system prototype (PoC)

  • System mockups for each role and the key screens, reviewed in UX/UI sessions with planners.
  • Implementation of the core planning functions identified in the audit, including hard constraints.
  • Automatic work plan generation, handed to the planner for validation.
  • Prototype running in an isolated test environment.
  • User acceptance testing (UAT) with planners and a demo of the working solution.
Milestone 330 November 2026

Production deployment and validation on real data

  • Deploying the system in the production environment and running it on real data.
  • Testing by the Technology Recipient's team against an acceptance checklist.
  • Measuring schedule preparation time against the baseline estimated during the audit.
  • Satisfaction survey among planners and decision makers at the Technology Recipient.
  • Improvement register and a roadmap for the system's further development.

Project partners

Technology Recipient

Gascontrol Polska sp. z o.o.

One of Poland's leading gas infrastructure contractors. Gascontrol Polska provides the operating environment in which the solution is designed, tested and validated. SolutionSpace was selected by the Technology Recipient from more than 60 startups.

gascontrol-polska.pl
Acceleration programme

Unicorn Hub Startup Booster

An acceleration programme funded by the European Union through PARP, supporting cooperation between startups and technology recipients and pilot deployments in real operating environments.

booster.unicornhub.pl

Funding

Project value
PLN 220,000.00
European Funds contribution
PLN 220,000.00

This project is co-funded by the European Union under the European Funds for a Modern Economy 2021–2027 programme.

EU Grants Map (Mapa Dotacji UE)

Let's talk about where technology will give you the most.

A short conversation, concrete ideas. We come back with an audit proposal or a scope of work.

SOLUTIONSPACE Sp. z o.o.
Zmyślanka 18
62-860 Opatówek, Poland
Also working in: Poznań · Warsaw
NIP 9681019139 · KRS 0001236506 · REGON 54454853800000

The controller of your data is SOLUTIONSPACE sp. z o.o., Zmyślanka 18, 62-860 Opatówek, e-mail: [email protected]. We process the data you provide (name, e-mail, message) to handle your enquiry and respond to you (legal basis: art. 6(1)(b) and (f) GDPR). We retain the data for as long as needed to handle the matter, no longer than 3 years from the last contact. You have the right to access, rectify, erase, restrict, object, and to lodge a complaint with the President of the UODO. Details in the Privacy Policy.